Witnica Industrial Zone / part of KSSSE, plot 973/12
Site description
The land is designated in the plan for technical and production development, depots, storage facilities, warehouses and commercial services (symbol 4 P, U)
· Parameters of buildings:
o The height of halls and administrative buildings is usually permitted up to 12–15 metres.
o High maximum building coverage ratio (typically up to 60–70% of the site area).
o Requirement to set aside a biologically active area (greenery) of at least 10–20%.
· Supplementary use:Possibility of locating internal car parks, transformer stations, gatehouses, technical infrastructure, as well as sidings and transshipment yards.
The plot has access to the roads serving the industrial zone (the area of ul. Stalowa, ul. Maszynowa and ul. Granitowa). Given the size of the plot, its boundaries allow wide entrance gates and manoeuvring loops for HGVs to be designed freely.
Electricity:
Like the neighbouring plots, this one also lies in the immediate vicinity of the Main Power Supply Point (GPZ Witnica) and the 110/15kV Electrical Substation. The proximity of the transformer station ensures trouble-free connection conditions for high energy demand.
· Water, Sewage and Gas:
All of these networks (the municipal water supply, sanitary sewage system and a medium-pressure gas pipeline for industry) run along the main streets of the zone (ul. Stalowa and partly ul. Granitowa). Connecting newly erected facilities requires applying to the operators (MZK Witnica and PSG) for technical conditions.
Due to the location of the electrical substation, overhead transmission lines run above part of the area of ul. Granitowa. Before the halls are designed, the protection zones (technological corridors) of these lines must be marked on the base map.
Basic information
| Voivodeship | Lubuskie |
|---|---|
| County | Powiat gorzowski |
| Municipality | Witnica |
| Town | Witnica |
| Plot numbers | 973/12 |
| Offer type | Land · Sale |
| Area | 26.22 ha (262,230 m²) |
| Proposed price | To be agreed |
| Owner | Local government |
| Local zoning plan (MPZP) | View plan → |
Location on the map
Utilities and infrastructure
- ✓ Electricity
- ✓ Water
- ✓ Gas
- ✓ Sewerage
- ✓ Fibre optic
Electricity
The plot lies in the immediate vicinity of the Main Power Supply Point (GPZ Witnica) and the 110/15kV Electrical Substation. The proximity of the transformer station ensures trouble-free connection conditions for high energy demand
Water
All of these networks (the municipal water supply, sanitary sewage system and a medium-pressure gas pipeline for industry) run along the main streets of the zone (ul. Stalowa and partly ul. Granitowa). Connecting newly erected facilities requires applying to the operators (MZK Witnica and PSG) for technical conditions
Sanitary sewerage
All of these networks (the municipal water supply, sanitary sewage system and a medium-pressure gas pipeline for industry) run along the main streets of the zone (ul. Stalowa and partly ul. Granitowa). Connecting newly erected facilities requires applying to the operators (MZK Witnica and PSG) for technical conditions
Storm sewerage
All of these networks (the municipal water supply, sanitary sewage system and a medium-pressure gas pipeline for industry) run along the main streets of the zone (ul. Stalowa and partly ul. Granitowa). Connecting newly erected facilities requires applying to the operators (MZK Witnica and PSG) for technical conditions
Gas
All of these networks (the municipal water supply, sanitary sewage system and a medium-pressure gas pipeline for industry) run along the main streets of the zone (ul. Stalowa and partly ul. Granitowa). Connecting newly erected facilities requires applying to the operators (MZK Witnica and PSG) for technical conditions
Telecommunications
A connection is possible.
Access roads
The property is located directly on ul. Granitowa (which is an extension/branch of ul. Stalowa).
State aid
An investment on this site may receive a support decision under the Polish Investment Zone. The aid takes the form of a corporate or personal income tax exemption (CIT or PIT), which the company uses for the validity period of the decision (14 years), up to the maximum aid amount, i.e. a specified percentage of eligible costs. Values for the municipality of Witnica:
| Company size | Aid Intensity | Minimum investment outlay - new plant | Minimum investment outlay - expansion of an existing plant |
|---|---|---|---|
| Large | 40% | 80,000,000 zł | 40,000,000 zł |
| Medium | 50% | 8,000,000 zł | 4,000,000 zł |
| Small | 60% | 4,000,000 zł | 2,000,000 zł |
| Micro | 60% | 1,600,000 zł | 800,000 zł |
BPO services: minimum investment outlay as for a small company. The project must also meet the qualitative criteria - at least 5 points.
Calculate aid for this location
Full state aid calculator → · The result is an estimate - details will be confirmed by the KSSSE team.