Production and warehouse hall Goleniów – Łozienica
Site description
A production and warehouse property located at ul. Boczna 5 in Łozienica, within the Goleniowski Park Przemysłowy (Goleniów Industrial Park). The complex comprises a modern hall with a usable floor area of approx. 4,235 m², including approx. 700 m² of office and staff facilities, situated on plots with a total area of 40,341 m² (4.0341 ha).
The facility was built in 2020, with a usable height of 12.88 m, and is adapted for production, warehousing and logistics operations. It has a steel structure with sandwich panel cladding, a high-load-capacity industrial floor, sectional doors, gas heating, mechanical ventilation, LED lighting and a sprinkler system.
The property also includes a workshop with facilities for drivers of approx. 220 m², a weighbridge building, retention tanks and manoeuvring yards.
The property is fully serviced - it has connections for electricity, natural gas, water, and sanitary and storm sewage. Infrastructure enabling industrial and warehousing operations is available.
The location provides convenient access to transport infrastructure: approx. 3 km from the S3 expressway, 7 km from Szczecin-Goleniów airport and 35 km from the seaport in Szczecin.
The property is offered for sale or lease.
Basic information
| Voivodeship | Zachodniopomorskie |
|---|---|
| County | Powiat goleniowski |
| Municipality | Goleniów |
| Town | Goleniów |
| Plot numbers | 55/16, 55/17, 89/9, 89/10 – obręb Łozienica |
| Offer type | Hall / warehouse · Sale and lease |
| Hall area | 4,235 m² |
| Plot area | 4.03 ha (40,341 m²) |
| Sale price | To be agreed |
| Rent | To be agreed |
| Owner | Private owner |
Location on the map
Utilities and infrastructure
- ✓ Electricity
- ✓ Water
- ✓ Gas
- ✓ Sewerage
Electricity
Access to the medium-voltage (MV) grid. The property has an electricity connection. 4 MW
Water
Connection to the water supply network - the property is fully serviced.
Sanitary sewerage
Connection to the sanitary sewage network.
Storm sewerage
Site drainage system and retention tanks.
Gas
Connection to the natural gas network.
Access roads
Access via a public road, ul. Boczna 5, within the Goleniowski Park Przemysłowy (Goleniów Industrial Park). Convenient connection to the S3 expressway - approx. 3 km.
State aid
An investment on this site may receive a support decision under the Polish Investment Zone. The aid takes the form of a corporate or personal income tax exemption (CIT or PIT), which the company uses for the validity period of the decision (14 years), up to the maximum aid amount, i.e. a specified percentage of eligible costs. Values for the municipality of Goleniów:
| Company size | Aid Intensity | Minimum investment outlay - new plant | Minimum investment outlay - expansion of an existing plant |
|---|---|---|---|
| Large | 40% | 80,000,000 zł | 40,000,000 zł |
| Medium | 50% | 8,000,000 zł | 4,000,000 zł |
| Small | 60% | 4,000,000 zł | 2,000,000 zł |
| Micro | 60% | 1,600,000 zł | 800,000 zł |
BPO services: minimum investment outlay as for a small company. The project must also meet the qualitative criteria - at least 5 points.
Calculate aid for this location
Full state aid calculator → · The result is an estimate - details will be confirmed by the KSSSE team.